Using crane to move pump
The pump is needed to clear water from boreholes before concreting.
A corer is withdrawn from the hole...
Checking the depth..
GPS base station
This, and the next few pictures, show two of the boreholes
Sun 20th Nov
No weekend working. Note tide covering lower causeway.
Flood tide pouring into flume pipe creates vortex
View from behind Harbour Office
View from steps to Clifton Terrace
Views from Clifton Terrace...
...at high tide.
A windless day, at slack high water
Tue 22nd Nov
Putting a trench in to main road footpath..
Bus shelter now gone!
Lifting rebar (reinforcing bar) assembly towards borehole...
Pump, boreholes, and drill bits at north end
Portable lighting for dark evenings...