July 2011
Friday 8th
Work has begun...
High tide in Copperhouse Pool. The old iron swing bridge is on the left, the Harbour Office on the right
The first stage is to construct a temporary causeway as a working platform. (The Tide Gate can be seen behind the iron bridge.)
The start of the causeway. (Clifton Terrace behind on the right.)
The bridge is part of a much wider redevelopment. North Quay (left), is also being rebuilt. (Above is Clifton Terrace, and right is KGVMW.)
View from car park on KGVMW
Sat 9th Jul
Zoomed view from the east of Copperhouse Pool, at High Water
Another distant view of the works
A view from KGVMW
Sat 30th Jul
The causeway reaches the LW mark...
...on both sides. Only a narrow channel remains for the in-and-out tidal flow